Costs

What forestry attachments actually cost

What a forestry attachment costs in Australia is not one number, and the purchase price is the smallest part of it. This page covers the five costs that make up an attachment, what moves each of them, and how to compare two quotes that look nothing alike.
Forestry attachments arranged beside an excavator in an Australian contractor yardField context
Capital, configuration and support all arrive on the same invoice.

The short answer

There is no honest single price for a forestry attachment in Australia, because the figure moves with the exchange rate, the model inside a range, rotation options and the carrier bracket. What is stable is the structure: four things drive the purchase price, and five separate costs make up what you actually pay to own and run the tool. Learn those and you can read any quote you are handed.

Why this page has no price list

Most sites in this category publish a price range. It is good for traffic and bad for buyers, because attachment pricing in Australia moves with the exchange rate, specification, rotation options and the carrier bracket. A figure published this quarter is routinely wrong by the next one, and a buyer who anchors on it arrives at a quote convinced they are being overcharged when they are not.

The more useful thing is the structure underneath the number. If you know what moves the price, you can interrogate a quote properly, work out why two suppliers are $8,000 apart, and tell the difference between a genuinely competitive offer and one that has quietly left the bracket, the hose kit and the freight out.

Where a figure is genuinely stable — tax thresholds, depreciation rates, utilisation thresholds — this page states it and cites the source.

An attachment has five costs, not one

The invoice is the only one most buyers plan for. The other four are where ownership economics are actually decided.
  1. 01

    Purchase

    Driven by carrier class, steel grade, rotation, and whether you take a turnkey kit. The largest single number and the one that stops mattering fastest as hours climb.
  2. 02

    Wear parts

    The dominant running cost, and it varies enormously by category. Teeth, blades, chains, bars and tips. Budget it monthly, not annually.
  3. 03

    Carrier wear

    Mulching and grinding put continuous load on a machine built for intermittent load. Pumps, coolers and final drives feel it, and service intervals tighten.
  4. 04

    Downtime

    Parts availability in Australia is the difference between a two-day repair and a six-week one. On a machine earning daily, this is the largest hidden cost in the category, and what differs by state decides how much you should hold yourself.
  5. 05

    Capital

    What the money would otherwise have earned, and what the attachment is worth when you are done with it. Rarely modelled, and it moves the answer on marginal purchases.

Why the invoice stops mattering

The same attachment, the same wear rate, five different levels of use. Only one line moves.

What the attachment itself costs per hour

Capital collapses as hours rise; wear parts do not move. Above roughly 500 hours a year the purchase price has stopped being the number that decides anything, which is the whole argument for costing by the hour rather than by the invoice.

Attachment cost per hour against annual operating hoursAt 150 hours a year, capital is $48.00 per hour and wear parts $7.50, totalling $55.50. At 300 hours a year, capital is $24.00 per hour and wear parts $7.50, totalling $31.50. At 500 hours a year, capital is $14.40 per hour and wear parts $7.50, totalling $21.90. At 750 hours a year, capital is $9.60 per hour and wear parts $7.50, totalling $17.10. At 1000 hours a year, capital is $7.20 per hour and wear parts $7.50, totalling $14.70. Based on a $45,000 attachment at 20 per cent residual over five years, and a $900 tooth set lasting 120 hours.CapitalWear parts150 hr/yr$55.50300 hr/yr$31.50500 hr/yr$21.90750 hr/yr$17.101,000 hr/yr$14.70200 hr — hire below this500 hr — ownership wins above thisWorked example: $45,000 attachment, 20% residual, 5 years, $900 tooth set lasting 120 hours

Carrier, operator and fuel are excluded here on purpose — you carry those whether or not you own this attachment. Change any of the inputs in the cost per stump calculator and the same arithmetic runs on your own figures.

What moves the purchase price

Four variables explain most of the gap between two quotes for what looks like the same attachment.
DriverWhat it changesWhat to ask for
Carrier classThe single biggest step. A model built for a 20 tonne machine carries more steel, bigger bearings and a larger motor than one built for 5 tonnes.The exact model, not the series. A BI300 and a BI500 are both tree shears.
Steel gradeAbrasion-resistant steels such as Hardox on tines, blades and wear plates cost more and deform less. Mild steel in a wear position is a false economy.Which components are abrasion-resistant steel and which are not.
RotationContinuous 360° rotation, and the rotator specified to deliver it, is often the largest single option on the quote. On some categories it is most of the productivity difference.Whether rotation is included, which rotator, and what it costs to replace.
Turnkey kitMachine-specific mounting bracket plus hose kit. Costs more up front and is nearly always worth it.Whether the bracket is machine-specific and who warrants it.

The bracket is not where to save money

A workshop-fabricated bracket that does not sit right will cost you more in cracked steel than the turnkey kit saved. The load path from a forestry attachment into the stick is not forgiving, and a bracket that is 5mm out concentrates it somewhere the designer did not intend.

Wear parts by category

The dominant running cost, and the one buyers price last. These are the patterns by category — the figures themselves are specific to your ground and your supplier, which is exactly why you should ask for them in writing.
CategoryMain consumableReplacement rhythmWhat accelerates it
Forestry mulchersTeeth and tipsMonthly budget line in abrasive groundStony or sandy soil, ground contact, working below grade
Stump grindersTeethMonthly in abrasive groundSandy or stony soil, buried metal, urban fill
Grapple sawsChains and barsWeekly conversationDirty timber, ground contact, incorrect chain tension
Tree shearsBlade rebuildPeriodicHardwood, buttressed stems, oversize diameter
Stump cuttersBlade and jaw rebuildPeriodicOversize material, embedded stone
Log and forestry grabsTine wear, rotator serviceLowGround scraping, side loading
Mechanical pruningBlades and cutting barsVaries by toolDirty bark, wire, dead hardwood
Tillage and compactionFlighting, teeth, plateLow to moderateRocky ground, reactive clay

The wear parts guide covers each category in detail, including why ground rather than timber decides tooth life. The useful question is not “what does a set of teeth cost” but “what does a set of teeth cost, how many hours does a set last in ground like mine, and how long does a replacement set take to arrive”. A cheaper set that lasts half as long is more expensive, and a cheap set that takes six weeks to land is not a set at all.

Three buyers, three different answers

The same attachment category produces completely different economics depending on how hard it runs and what it runs in.
Entry level

Arborist running 150–200 hours a year

At this utilisation the purchase price dominates and wear parts barely register. Hire or subcontract is usually the right answer, and if you do buy, buy for resale value and simplicity rather than for the lowest cost per hour. A tool that sits in the yard eleven months a year does not repay a premium specification.

Purchase price dominates

Mid range

Civil contractor running 300–500 hours a year

The crossover band. Buy if the tool unlocks work you currently turn away, because the marginal revenue matters more than the marginal cost per hour. Wear parts start to show up in the monthly figures and parts lead time starts to matter. This is where the turnkey kit argument is strongest, because downtime now costs real money.

Wear parts become visible

High utilisation

Vegetation or clearing contractor above 500 hours a year

Ownership almost always wins, and the purchase price becomes a secondary consideration. Wear-part pricing, parts availability in Australia and the service network decide the total cost. At this level a six-week parts wait is a revenue event, and buying on invoice price alone is the most expensive decision available.

Parts supply decides the total

The utilisation test

Attachments are cheap compared to carriers, but they are not free, and hours a year is the number that decides whether you should own one at all.

Rough guidance, and it is guidance rather than gospel. Below about 200 hours a year, hire or subcontract. Between 200 and 500, buy if the tool unlocks work you currently turn away. Above 500, ownership almost always wins, and wear-part supply becomes more important than purchase price.

The trap is counting the hours you hope to run rather than the hours you have actually run in the last two years. An attachment bought on optimistic utilisation is the most common bad purchase in this category, and it is usually visible in the yard within a season. The hire versus buy page works through the decision properly.

Tax treatment, stated accurately

Most forestry attachments cost well above the instant asset write-off threshold, so the write-off is usually not the relevant mechanism.

The instant asset write-off threshold is $20,000 per asset, and in the 2026-27 Budget it was announced to be made permanent from 1 July 2026 for small businesses with aggregated turnover under $10 million. As at mid-2026 the enabling legislation had not passed Parliament, and until it does the standing legislated threshold for assets first used from 1 July 2026 is $1,000.

For an attachment costing more than the threshold, the asset joins the small business pool and depreciates at 15% in the first year and 30% in each year after. There is a timing trap worth knowing: the test is that the asset is first used or installed ready for use within the income year, not ordered or paid for. An imported attachment sitting on a wharf on 30 June does not qualify.

General information, not advice

This is a summary of publicly available Australian Taxation Office guidance, written as general information. It is not tax advice and does not account for your circumstances. Confirm your own position with your accountant before you time a purchase around it. Finance and tax covers the pool rates and the first-use timing trap in full. Thresholds and legislation status change — see the sources page for what this is based on.

Making two quotes comparable

Most quote comparisons fail because the two documents describe different scopes. Reduce both to the same list before you look at the totals.

Itemise before you compare

  • Exact model, not the series name
  • Carrier make, model and operating weight the quote is built for
  • Rotation: included or optional, and which rotator
  • Mounting bracket: machine-specific or generic
  • Hose kit and fittings, or supply-only
  • Case drain line where the motor requires one
  • Freight: ex-works or delivered to your depot
  • Installation and commissioning labour
  • Warranty term, and what it covers on wear items
  • Wear-part pricing in writing
  • Wear-part lead time and what is held in Australia
  • Whether a trial or demonstration is available

Red flags in an attachment quote

Not all of these are deal-breakers. All of them are worth a direct question before you sign.
  • A quote materially below the others

    Usually scope, not generosity. Check the model inside the range, whether rotation is included, and whether the bracket and hose kit are in or out.

  • No wear-part pricing offered

    Wear parts are the dominant running cost. A supplier who will not quote them before the sale is unlikely to be sharper about them afterwards.

  • Vague carrier compatibility

    "Suits 5 to 20 tonne" is a range, not a match. Ask for the specific model against your machine's operating weight, auxiliary flow and pressure.

  • No case drain where the motor needs one

    Piston motors usually need drainage back to tank. Skipping it kills motor seals, often inside a season, and it is rarely covered by warranty.

  • Generic mounting bracket on a heavy attachment

    The load path from a forestry attachment into the stick is unforgiving. A bracket that does not sit right cracks steel that is expensive to repair.

  • Parts held only overseas

    The difference between a two-day repair and a six-week one. On a machine running 500 hours a year this outweighs a difference on the invoice.

  • Quick hitch not to standard

    Quick hitches should comply with AS 4772-2008 or an equivalent such as ISO 13031-2016. Heavy attachments swung at height make this a live risk, not paperwork.

  • Price valid for an unusually long period

    Attachment pricing moves with the exchange rate. A price held for six months is either carrying a margin buffer or is about to be revised.

Frequently asked questions

01

How much does a forestry attachment cost in Australia?

There is no single figure, and any site publishing one is quoting a number that was accurate on the day it was written. Attachment pricing moves with the exchange rate, the model within a range, rotation options and the carrier bracket, so a figure published today is routinely wrong within a quarter. What does not move is the structure underneath it: carrier class, steel grade, rotation, and whether you take a turnkey kit. Understand those four and you can interrogate any quote you are handed.
02

Why does the same attachment vary so much between quotes?

Usually because the quotes are not for the same thing. The most common differences are the model inside a range (a BI300 and a BI500 are both “a tree shear”), whether rotation is included, whether the price carries a machine-specific mounting bracket and hose kit or leaves you to fabricate one, and whether freight to your depot is in or out. Ask for all four to be itemised and most of the gap explains itself.
03

What is the biggest running cost on a forestry attachment?

Wear parts, by a wide margin, and it varies enormously by category. Mulcher teeth in abrasive or stony ground are a consumable you budget monthly. Shear blades are a periodic rebuild. Saw chains and bars on a grapple saw are a weekly conversation. Ask every supplier for wear-part pricing and lead time before you sign, not after — it is the number that decides your cost per hour, and it is the one most buyers never ask for.
04

Should I buy the cheapest attachment that fits my machine?

Only if the utilisation is low enough that running cost barely matters. Above roughly 500 hours a year the purchase price stops being the dominant number and wear-part supply and parts availability take over. At that point a cheaper attachment with a six-week parts lead time costs more than a dearer one with stock in the country, because the difference is measured in lost days rather than dollars on the invoice.
05

Is a turnkey kit worth the extra cost?

Nearly always. A turnkey kit is the machine-specific mounting bracket plus hose kit, supplied with the attachment. It costs more up front, and a workshop-fabricated bracket that does not sit right will cost you more in cracked steel than the kit ever saved. The exception is a workshop that regularly builds brackets for your exact machine and stands behind them.
06

Does an attachment increase my excavator's running costs?

Mulching and grinding do, materially. Both put continuous load on a machine designed for intermittent load, and pumps, coolers and final drives feel it. If you intend to run a mulcher hard, budget for improved cooling and expect your carrier’s service intervals to tighten. Handling attachments such as grabs are far gentler and barely move the carrier’s cost line.
07

Can I claim a forestry attachment on the instant asset write-off?

Usually not, because most forestry attachments cost well above the threshold. The instant asset write-off threshold is $20,000 per asset, and the 2026-27 Budget announced it would be made permanent from 1 July 2026 for small businesses with aggregated turnover under $10 million. As at mid-2026 the enabling legislation had not passed Parliament, and until it does the standing legislated threshold for assets first used from 1 July 2026 is $1,000. Above the threshold the asset joins the small business pool at 15% in the first year and 30% each year after. This is general information, not tax advice — confirm your position with your accountant.
08

Does freight to regional Australia change the number much?

Enough to be worth asking about before you compare quotes. Forestry attachments are dense, heavy freight, and a quote that is competitive ex-Sydney may not be once it is on a truck to regional Queensland or across the Nullarbor. Ask whether the quoted figure is ex-works or delivered, and confirm who carries the risk in transit.
09

What is the real cost of an attachment sitting idle waiting for parts?

For a contractor running 500 hours a year, a six-week parts wait in the middle of a season is not a parts problem, it is a revenue problem. This is the strongest argument for buying through a local distributor holding stock rather than importing direct on price. Ask what is held in Australia, what is air-freighted, and what the realistic lead time is on the parts that actually wear.
10

How do I compare two quotes that look completely different?

Reduce both to a cost per hour over the hours you will actually run. Take the purchase price less realistic residual, divide by expected life in hours, then add wear parts per hour, carrier cost per hour, operator and fuel. The cost per stump calculator and cost per hectare calculator do this arithmetic for the two categories where it matters most.
Frequently asked questions

Where to go next

Wear parts in detailThe dominant running cost, category by category, and what drives the rate.
Hire, buy or subcontractWork the utilisation decision properly before you price anything.
Finance and taxDepreciation, the write-off threshold and the first-use timing trap.
Parts and supportFreight, lead time and what to hold on your own shelf.
Cost per stump calculatorTurn these cost lines into a figure per stump for grinding work.
Cost per hectare calculatorThe same arithmetic for mulching and clearing, priced by area.
What suits your carrierBefore costing anything, confirm the categories your machine can actually run.
The full buyer's guideStart at the hub if you are still choosing between categories.
Request a quoteBring operating weight, auxiliary flow and working pressure.